Investigators | Title | Agency/Sponsor | Grant Total | GrantPeriod |
PI | IAC Sub-Task 1.5 – Project and Risk Management Support for Major Corridors | TxDOT Austin District | $207,185 | 9/1/20 – 8/31/24 |
Co-PI with Mulva | Investigating new Business Models for the Capital Projects Industry | EDRC – South Korea | $33,333 | 3/1/20 – 2/28/21 |
Co-PI with Mulva | Studying the Use of Modularization on Industrial Projects | EDRC – South Korea | $80,000 | 3/1/20 – 2/28/21 |
Co-PI with Mulva | Operating System 2.0 Industry Affiliates Program | ExxonMobil, BHP, Shell, Suncor, COAA, EDRC | $3,191,667 | 10/1/19 – 9/30/22 |
Co-PI with Mulva | Analysis of Advanced Work Packaging and Other Productivity Improvement Practices | EDRC – South Korea | $73,333 | 9/1/19 – 1/31/20 |
Co-PI with Faust | RT 365 Promoting the Use of Advanced Work Packaging – Phase 2 | CII | $185,124 | 7/1/19 – 1/31/21 |
PI | RT DCC-04 Promoting the Use of Advanced Work Packaging – Phase 1 | CII | $42,345 | 1/1/19 – 6/30/19 |
PI | IAC Task – Planning and Controlling Utility Adjustments | TxDOT Austin District | $146,788 | 9/1/17 – 8/31/19 |
PI at UT with Goodrum, Hallowell, and Van Boven (PIs at CU) | A Research Program to Double the Downstream and Chemicals Sector Productivity | CII | $206,197 | 5/1/17 – 9/15/18 |
Co-PI with Freund | Corporate Best Practices for Successful Productivity Improvement Programs | CII | $241,200 | 9/1/15 – 1/15/19 |
PI | IAC Task – Planning and Controlling Utility Adjustments | TxDOT Austin District | $100,000 | 9/1/15 – 8/31/17 |
Co-PI with Mulva | Management Practices and Productivity Measurement for the Energy & Chemicals and Process Construction & Maintenance Industry | Singapore EDB | $2,993,753.17 | 8/1/15 – 7/31/18 |
Co-PI with Mulva | Integrated Approach to Management Practices and Productivity Measurement for the Singapore Chemicals Industry – Phase 1 | Singapore EDB | $156,167 | 4/1/14 – 6/30/14 |
PI | Successful Delivery of Megaprojects | CII | $185,610 | 9/1/13 – 8/31/15 |
PI | IAC Task – Planning and Controlling Utility Relocations | TxDOT Austin District | $199,127 | 9/1/13 – 8/31/15 |
PI | IAC Task – Investigating and Analyzing Utility Adjustment Factors | TxDOT Dallas District | $181,495 | 9/1/13 – 8/31/17 |
PI | Development of an Indoor Intelligent and Automated Construction Job Site Testbed | NIST | $970,387 | 4/1/09 – 6/30/14 |
Co-PI with Mulva | Integration of Benchmarking Databases | CII | $243,056 | 6/1/11 – 8/31/17 |
Co-PI with Mulva | Benchmarking of Healthcare Projects | CII | $69,916 | 9/1/12 – 8/31/17 |
PI with O’Connor | Transferring Experiential Knowledge from the Near-retirement Generation to the Next Generation | CII | $209,547 | 9/1/11 – 8/31/13 |
PI with Prozzi, Loftus-Otway, Clower, and Bomba | Linking Regional Planning with Project Planning in Support of NEPA | TxDOT | $212,996 | 9/1/11 – 12/31/12 |
Co-PI with Fan, Leite, and Seedah | Prevention of Backing Fatalities in Construction Work Zones | TxDOT | $296,864 | 9/1/11 – 8/31/13 |
PI | IAC Task – Improving Utility Adjustment Procedures | TxDOT Austin District | $90,000 | 9/1/11 – 8/31/13 |
PI with Bhat, Kockelman, Loftus-Otway, and Hutson | Condemnation in Transportation Projects: Causes and Solutions | TxDOT | $145,295 | 9/1/10 – 2/28/12 |
Co-PI with Prozzi, Loftus-Otway, and Zhang | Potential Value Extraction from TxDOT’s Right of Way and Other Property Assets | TxDOT | $202,000 | 9/1/10 – 2/28/12 |
Co-PI with Mulva | Effects of Project Management Practices on the Performance of Capital Facility Projects | CII | $66,417 | 9/1/10 – 8/31/12 |
PI | Task – Analyzing and Improving Utility Adjustments’ Schedule and Right-of-Way Acquisition Cost Performance | TxDOT Austin District | $131,113 | 9/15/09 – 8/31/11 |
Co-PI with Mulva and Jablonowski | Development of a Benchmarking System for Upstream Oil and Gas Projects | FEC/UFF/Petrobras | $598,617 | 11/01/08 – 08/31/10 |
Co-PI with Zhang | Complete Implementation of Electronic Appraisal System | TxDOT | $208,000 | 3/31/08 – 8/31/09 |
PI at UT with Haas (PI at UW) and Goodrum (PI at UK) | Craft Productivity Research Program | CII | $907,833 | 9/1/07 – 12/31/13 |
PI with Menches and Reyes (from Baylor) | Global Procurement and Materials Management | CII | $254,962 | 9/1/07 – 8/31/09 |
Co-PI with Menches and O’Connor | Synthesis Study of Programs Used to Reduce the Need for Inspection Personnel | TxDOT | $113,413 | 9/1/07 – 8/31/08 |
PI | Task – Analyzing ROW Risks, Improving the Accuracy and Completeness of ROW Schedules, and Investigating Methods to Enhance ROW Tracking | TxDOT Austin District | $92,000 | 9/1/07 – 8/31/09 |
PI at UT with Haas(PI at UW) and Goodrum (PI at UK) | Leveraging Technology to Improve Construction Productivity | CII | $199,747 | 9/1/06 – 8/31/08 |
Co-PI with Zhang | Implementation of the Electronic Appraisal System | TxDOT | $135,000 | 9/1/06 –8/31/07 |
PI | Performance Test Methods for Automated Structural Steel Pick-and-Place | NIST | $444,762 | 4/1/06 – 3/31/09 |
PI at UT with Gibson (PI at UA) | Effective Management Practices and Technologies for Lessons Learned Programs | CII | $125,687 | 9/1/05 – 8/31/07 |
PI with Zhang, Persad, and Kockelman | Best Practices in ROW Valuations and Negotiations | TxDOT | $84,943 | 9/1/05 – 8/31/06 |
PI with Gibson at UA (subcontract) | Optimizing the Identification of Right-of-Way Requirements during the Project Development Process | TxDOT | $208,510 | 9/1/05 – 8/31/07 |
Co-PI with Prozzi | Tracking the Performance of HMA Mixtures in Texas | TxDOT | $229,162 | 9/1/05 – 8/31/08 |
Co-PI with Kockelman and Zhang | Implementation of a Right-of-Way (ROW) Acquisition Cost Estimating Planning Tool | TxDOT | $162,000 | 3/16/05 – 8/31/06 |
PI | Real-Time Spatial Information Acquisition and Use for Infrastructure Construction and Maintenance | NSF | $364,682 | 9/1/04 –8/31/07 |
PI | Development of Obstacle Detection Algorithms for Construction Machinery using a High Frame-rate Flash LADAR Sensor | NIST | $50,640 | 9/21/04 –9/20/06 |
PI | IPA – Kamel Saidi | NIST | $98,431 | 9/1/04 – 3/31/06 |
Co-PI with O’Connor | Effectiveness of Combined Utility Relocation/Highway Construction Projects | TxDOT | $248,916 | 9/1/04 –8/31/06 |
Co-PI with Zhang | Electronic Appraisal Development Study | TxDOT | $227,646 | 9/1/04 –8/31/06 |
PI | Field Systems and Construction Automation Laboratory – Special Equipment Allocation | UT-CoE | $140,000 | 9/1/04 – |
PI | Research Initiation | UT-CoE | $5,000 | 9/1/04 – |
TOTAL: | $15,760,866 |