Books
[1] A. Shtub, J.F. Bard and S. Globerson (2005), Project Management: Processes, Methodologies, and Economics, Prentice Hall, Upper Saddle River, NJ. [2] P.A. Jensen and J.F. Bard (2003), Operations Research: Models and Methods, John Wiley & Sons, New York. http://utw11041.utweb.utexas.edu/ORMM/http://he-cda.wiley.com/WileyCDA/HigherEdTitle/productCd-0471380040.html
[3] J. Keogh, A. Shtub, J.F. Bard and S. Globerson (2000), Project Planning and Implementation, Pearson, Boston. [4] J.F. Bard (1998), Practical Bilevel Optimization: Algorithms and Applications, Kluwer Academic Publishers, Boston. http://www.wkap.nl/prod/b/0-7923-5458-3 [5] K. Shimizu, Y. Ishizuka and J.F. Bard (1997), Nondifferentiable and Two-Level Programming, Kluwer Academic Publishers, Boston. http://www.wkap.nl/prod/b/0-7923-9821-1 [6] A. Shtub, J.F. Bard and S. Globerson (1994), Project Management: Engineering, Technology and Implementation, Prentice Hall, Englewood Cliffs, NJ.Book Chapters
[7] A. Mobasher, G. Lim, J.F. Bard and V. Jordan (2013). Daily Scheduling of Nurses in Operating Suites. Handbook of Industrial & Systems Engineering, A.B. Badiru (ed.), Chapter 55, pp. 1217-1241, Taylor & Francis, New York. [8] J.F. Bard (2010). Nurse Scheduling Models. In Wiley Encyclopedia of Operations Research and Management Science, J.J. Cochran, L.A. Cox, Jr., P. Keskinocak, J.F. Kharoufeh and J.C. Smith (eds.), Topic 4.3, Medicine and Health Care, vol. 5, pp. 3617-3627, John Wiley & Sons, NY. [9] D.P. Morton, J.F. Bard and Y.M. Wang (2010). A Branch-and-Price Algorithm for the Stochastic Generalized Assignment Problem. In Computational Optimization: New Research Developments, R.F. Linton and T.B. Carroll Jr. (eds.), Chapter 7, pp. 207-236, Nova Publishers, Hauppauge, NY. [10] J.F. Bard (2005). Project Scheduling. In Handbook of Industrial & Systems Engineering, A. Badiru (ed.), Chapter 4, pp. 4.1-4.46, CRC Press, Boca Raton, FL. [11] J.F. Bard (2001). Bilevel Linear Programming: Formulation and Properties. In Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 8, pp. 137-140, Kluwer Academic Publishers, Amsterdam. [12] J.F. Bard (2001). Bilevel Linear Programming: Complexity and Equivalence to Minmax Problem. In Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 9, pp. 140-144, Kluwer Academic Publishers, Amsterdam. [13] J.F. Bard (2001). Bilevel Programming in Management. In Encyclopedia of Optimization, P.M. Pardalos and C.A. Floudas (eds.), Chapter 17, pp. 173-177, Kluwer Academic Publishers, Boston. [14] J.F. Bard (1998). Conceptual Design and Analysis of Rail Car Unloading Area. In Industrial Applications of Combinatorial Optimization, G. Yu (ed.), pp. 272-300, Kluwer Academic Publishers, Boston. [15] J.F. Bard, J. Plummer and J.C. Sourie (1998). Determining Tax Credits for Converting Nonfood Crops to Biofuels: An Application of Bilevel Programming. In Multilevel Optimization: Algorithms and Applications, A. Migdalas, P.M. Pardalos, P. Varbrand (eds.), pp. 23-50, Kluwer Academic Publishers, Boston. [16] M. Arguello, J.F. Bard and G. Yu (1998). Models and Methods for Managing Airline Irregular Operations. In Operations Research in the Airline Industry, G. Yu (ed.), pp. 1-45, Kluwer Academic Publishers, Boston. [17] J.F. Bard (1989). Optimizing the R&D Portfolio. In Early Warning Signals for R&D Projects, R. Balachandra, Chapter 6, pp. 107-121, Lexington Books, D.C. Heath and Company, Lexington, MA. [18] J.F. Bard (1986). The Evolution of Robotics in Manufacturing. In Modelling and Design of Flexible Manufacturing Systems, A. Kusiak (ed.), pp. 33-63, Elsevier Science Publishing, Amsterdam.Journals
[19] B. Calci, B.D Leibowicz and J.F. Bard, G. Jayadev (2022). Incorporating Learning-by-Doing into Mixed Complementarity Equilibrium Models. Computers & Industrial Engineering 159. https://doi.org/10.1016/j.cie.2021.107472 [20] B. Calci, B.D Leibowicz and J.F. Bard (2022). North American Natural Gas Markets under LNG Demand Growth and Infrastructure Restrictions. The Energy Journal 43(2), 17-40. [21] J. Guo, J.F. Bard, D.J. Morrice, C. Jaén and R. Poursani (2022). Offering Transportation Services to Economically Disadvantaged Patients at a Family Health Center. Health Systems 11(4), 251-275. [22] Y. Hur, J.F. Bard, D.J. Morrice (2020). Appointment Scheduling at a Multidisciplinary Outpatient Clinic Using Stochastic Programming. Naval Research Logistics 68(1), 134-155. https://doi.org/10.1002/nav.21895 [23] D.J. Morrice, J.F. Bard, K.M. Koenig (2020). Designing and Scheduling a Multi-provider Integrated Practice Unit for Patient-Centered Care. Health Systems 9(4), 293-316. https://doi.org/10.1080/20476965.2019.1569481 [24] F. Kiermaier, M. Frey and J.F. Bard (2020). The Flexible Break Assignment Problem for Large Tour Scheduling Problems with an Application to Airport Ground Handlers. Journal of Scheduling 23(2), 177-209. [25] S. McRae, J.O. Brunner and J.F. Bard (2019). Analyzing Economies of Scale and Scope in Hospitals by use of Case Mix Planning. Health Care Management Science 23(1), 80-101. [26] S. Jia, D.J. Morrice and J.F. Bard (2019). A Performance Analysis of Dispatch Rules for Semiconductor Assembly & Test Operations. Journal of Simulation 13(3), 163-180. [27] Y. Hur, J.F. Bard, R. Chacon (2019). Hierarchy Machine Setup for Multi-pass lot Scheduling at Semiconductor Assembly and Test Facilities. International Journal of Production Research 57(14), 4351-4370. [28] P. Zhang, J.F. Bard, D.J. Morrice and K.M. Koenig (2019). Extended Open Shop Scheduling with Resource Constraints: Appointment Scheduling for Integrated Practice Units. IISE Transactions on Engineering & Analytics 51(10), 1037-1060. [29] Y. Hur, J.F. Bard, M. Frey and F. Kiermaier (2019). A Stochastic Optimization Approach to Shift and Break Scheduling for Airport Workers. Computers & Operations Research 107, 127-139. [30] R.Z. Rios-Mercado and J.F. Bard (2019). An Exact Algorithm for Designing Optimal Districts in the Recycling of Waste Electric and Electronic Equipment through an Improved Reformulation. European Journal of Operational Research 276(1), 259-271. [31] Y. Hur, J.F. Bard, M. Frey and F. Kiermaier (2019). An Investigation of Shift and Break Flexibility with Real-time Break Assignments Using a Rolling Horizon Approach. Flexible Services and Manufacturing Journal 31(1), 174–211. [32] D. Wang, D.J. Morrice, K. Muthuraman, J.F. Bard, L.K. Leykum and S.H. Noorily (2018). Coordinated Scheduling for a Multi-Server Network in Outpatient Surgical Care. Production and Operations Management 27(3) 458-479. [33] D.J. Morrice, J.F. Bard, L.K. Leykum and S. Noorily (2018). The Impact of a Patient-Centered Surgical Home Implementation on Preoperative Processes in Outpatient Surgery. IIE Transactions on Healthcare Systems Engineering 8(2), 155-166. [34] C. Zhang, J.F. Bard and R. Chacon (2017). Controlling Work in Process during Semiconductor Assembly and Test Operations. International Journal of Production Research 55(24), 7251-7275. [35] J.F. Bard, Z. Shu, D.J. Morrice and L.K. Leykum (2017). Constructing Block Schedules for Internal Medicine Residents. IIE Transactions on Healthcare Systems Engineering 7(1), 1-14. [36] Y. Yang and J.F. Bard (2017). Internal Mail Transport at Processing & Distribution Centers. IISE Transactions on Design & Manufacturing 49(3), 285-303. [37] S. Lin, J.F. Bard, A.I. Jarrah, X. Zhang and L.J. Novoa (2017). Route Design for Last-in, First-out Delivery with Backhauling. Transportation Research C: Emerging Technologies 76, 90-117. [38] F. Kiermaier, M. Frey and J.F. Bard (2016). Flexible Cyclic Rostering in the Service Industry. IIE Transactions on Operations Engineering & Analytics 48(12), 1139-1155. [39] A.I. Jarrah, X. Qi and J.F. Bard (2016). The Destination-Loader-Door Assignment Problem for Cross-Docking Facilities. Transportation Science 50(4), 1314–1336. [40] J.F. Bard, Z. Shu, D.J. Morrice and L.K. Leykum (2016). Annual Block Scheduling for Internal Medicine Residents with 4+1 Templates. Journal of the Operational Research Society 67(7), 911-927. [41] G. Lim, A. Mobasher, J.F. Bard and A. Najjarbashi (2016). Nurse Scheduling with Lunch Break Assignments in Operating Suites. Operations Research for Health Care 10, 35-48. [42] J.F. Bard, Z. Shu, D.J. Morrice, L. Leykum and R. Poursani (2016). Block Scheduling for Family Medicine Residency Programs. IIE Transactions on Operations Engineering & Analytics 48(9), 797-811. [43] S. Lin, G.J. Lim and J.F. Bard (2016). Benders Decomposition and an IP-based Heuristic for Selecting IMRT Treatment Beam Angles. European Journal of Operational Research 251(3), 715-726. [44] J.F. Bard, Z. Shu, D. Morrice, D. Wang, R. Poursani and L. Leykum (2016). Improving Patient Flow at a Family Health Clinic. Health Care Management Science 19(2), 170-191. [45] D. Rossit, F. Tohme, M. Frutos, J.F. Bard and D. Broz (2016). A Non-permutation Flowshop Scheduling Problem with Lot Streaming: A Mathematical model. International Journal of Industrial Engineering Computations 7(3), 507-516. [46] S. Jia, J.F. Bard, R. Chacon and J. Stuber (2015). Improving Performance of Dispatch Rules for Daily Scheduling of Assembly and Test Operations. Computers & Industrial Engineering 90, 86-106. [47] J.F. Bard, S. Jia, R. Chacon and J. Stuber (2015). A Comparison of Optimization and Simulation Approaches for Daily Scheduling of Assembly & Test Operations. International Journal of Production Research 53(9), 2617-2632. [48] Y. Qu and J.F. Bard (2015). A Branch-and-Price-and-Cut Algorithm for Heterogeneous Pickup and Delivery Problems with Configurable Vehicle Capacity. Transportation Science 49(2), 254-270. [49] Z. Gao, J.F. Bard, R. Chacon and J. Stuber (2015). An Assignment-Sequencing Methodology for Scheduling Assembly and Test Operations with Multi-pass Requirements. IIE Transactions on Design & Manufacturing 47(2) 153-172. [50] Y. Hu, B. Xu, J.F. Bard, H. Chi and M. Gao (2015). Optimization of Multi-fleet Aircraft Routing Considering Passenger Transiting under Airline Disruption. Computers & Industrial Engineering 80, 132-144. [51] D.J. Morrice, E. Wang, J.F. Bard, L. Leykum, S. Noorily and P. Veerapaneni. (2014). A Patient-Centered Surgical Home to Improve Outpatient Surgical Processes of Care and Outcomes. IIE Transactions on Healthcare Systems Engineering 4(3), 119-134. [52] J.F. Bard, Z. Shu and L. Leykum (2014). A Network Approach for Monthly Scheduling of Residents in Primary Care Clinics. Operations Research for Health Care 3(4), 200-214. [53] J.F. Bard, Y. Shao, X. Qi and A.I. Jarrah (2014). The Traveling Therapist Scheduling Problem with Fixed Appointment Times. IIE Transactions on Operations Engineering & Analytics 46(7), 683-706. [54] Y. Shao, J.F. Bard and A.I. Jarrah (2014). A Sequential GRASP for the Therapist Routing and Scheduling Problem. Journal of Scheduling 17(2), 109-133. [55] J.F. Bard, Z. Shu and L. Leykum (2013). Monthly Clinic Assignments for Internal Medicine Housestaff. IIE Transactions on Healthcare Systems Engineering 3(4), 207-239. [56] J. Brunner, J.F. Bard and J.M. Köhler (2013). Bounded Flexibility in Days-on and Days-Off Scheduling. Naval Research Logistics 60(8), 678-701. [57] Y. Qu and J.F. Bard (2013). The Heterogeneous Pickup and Delivery Problem with Configurable Vehicle Capacity. Transportation Research, Part C: Emerging Technologies 32, 1-20. [58] J.F. Bard, Z. Gao, R. Chacon and J. Stuber (2013). Daily Scheduling of Multi-Pass Lots at Assembly and Test Facilities. International Journal of Production Research 51(23-24), 7047-7070. [59] S. Yeh, L. Leykum, J. O’Rouke and J.F. Bard (2013). Using Systems Engineering to Improve Housestaff Scheduling and Clinic Utilization. Journal of General Internal Medicine 28, S448-S449. [60] J.F. Bard, Y. Shao and H. Wang (2013). Weekly Scheduling Models for Traveling Therapists. Socio-Economic Planning Sciences 47(3), 191-204. [61] S.K. Health, J.F. Bard and D.J. Morrice (2013). A GRASP for Simultaneously Assigning and Sequencing Product Families on Flexible Assembly Lines. Annals of Operations Research 203(1), 295-323. [62] J. Brunner and J.F. Bard (2013). Flexible Weekly Tour Scheduling for Postal Service Workers. Journal of Scheduling 39(1), 129-149. [63] J.F. Bard and A.I. Jarrah (2013). Integrating Commercial and Residential Pickup and Delivery Networks: A Case Study. Omega 41(4), 706-720. [64] J.F. Bard, Z. Gao, R. Chacon and J. Stuber (2012). Real-time Decision Support for Assembly and Test Operations in Semiconductor Manufacturing. IIE Transactions on Design & Manufacturing 44(12), 1083-1099. [65] A.I. Jarrah and J.F. Bard (2012). Large-Scale Pickup and Delivery Work Area Design. Computers & Operations Research 39(12), 3102-3118. [66] Y. Shao, J.F. Bard and A.I. Jarrah (2012). The Therapist Routing and Scheduling Problem. IIE Transactions on Operations Engineering & Analysis 44(10), 868-893. [67] Y. Qu and J.F. Bard (2012). A GRASP with Adaptive Large Neighborhood Search for Pickup and delivery Problems with Transshipment. Computers & Operations Research 39(10), 2439–2456. [68] A. Mobasher, G. Lim, J.F. Bard and V. Jordan (2011). Daily Scheduling of Nurses in Operating Suites. IIE Transactions on Healthcare Systems Engineering 1(4), 232-246. [69] J.O. Brunner, J.F. Bard and R. Kolisch (2011). Midterm Physician Scheduling with Flexible Shifts Using Branch-and-Price. IIE Transactions on Operations Engineering & Analysis 43(2), 84-109. [70] A.I. Jarrah and J.F. Bard (2011). Pickup and Delivery Network Segmentation Using Contiguous Geographic Clustering. Journal of the Operational Research Society 62(10), 1827-1843. [71] Y. Deng and J.F. Bard, (2011). A Reactive GRASP with Path Relinking for Capacitated Clustering. Journal of Heuristics 17(2), 119-152. [72] J.F. Bard, Y. Deng, R. Chacon and J. Stuber (2010). Midterm Planning to Minimize Deviations from Daily Target Outputs in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 23(3), 456-467. [73] J.F. Bard and N. Nananukul (2010). A Two-Stage Supply Chain Planning Problem with Inventory Routing. Computers & Operations Research 37(12), 2202-2217. [74] J.F. Bard, A.I. Jarrah and J. Zan (2010). Validating Vehicle Routing Zone Construction Using Monte Carlo Simulation. European Journal of Operational Research 206(1), 73-85. [75] Y. Deng, J.F. Bard, R. Chacon and J. Stuber (2010). Scheduling Back-End Operations in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing 23(2), 210-220. [76] J.O. Brunner, J.F. Bard and R. Kolisch (2009). Flexible Shift Scheduling of Medical Residents. Health Care Management Science 12(3), 285-305. [77] J.F. Bard and N. Nananukul (2009). The Integrated Production-Inventory-Distribution-Routing Problem for a Single Commodity. Journal of Scheduling 12(3), 257-280. [78] J.F. Bard and A.I. Jarrah (2009). Large-Scale Constrained Clustering for Rationalizing Pickup and Delivery Operations. Transportation Research, Part B: Methodological 43(5), 542-561. [79] J.F. Bard and N. Nananukul (2009). Heuristics for a Multiperiod Inventory Routing Problem with Production Decisions. Computers & Industrial Engineering 57(3), 713-723. [80] J.F. Bard and L. Wan (2008). Workforce Design with Movement Restrictions between Workstation Groups. Manufacturing and Service Operations Management 40(1), 24-42. [81] J.F. Bard and D.N. Mohan (2008). Reallocating Arrival Slots during a Ground Delay Program. Transportation Research Part B: Methodological 42(2), 113-134. [82] S.K. Monkman, D.J. Morrice and J.F. Bard (2008). A Production Scheduling Heuristic for an Electronics Manufacturer with Sequence Dependent Setup Costs. European Journal of Operational Research 187(3), 1100-1114. [83] J.F. Bard and H.W. Purnomo (2007). Cyclic Preference Scheduling of Nurses Using a Lagrangian-Based Heuristic. Journal of Scheduling 10(1), 5-23. [84] G. Zhu, J.F. Bard and G. Yu (2007). A Two-Stage Stochastic Programming Approach for Project Planning with Uncertain Activity Durations. Journal of Scheduling 10(3), 167-180. [85] J.F. Bard, D.P. Morton and Y.M. Wang (2007). Workforce Planning at USPS Mail Processing & Distribution Centers Using Stochastic Optimization. Annals of Operations Research 155(1), 51-78. [86] L. Wan and J.F. Bard (2007). Weekly Staff Scheduling with Workstation Group Restrictions. Journal of the Operational Research Society 58(8), 1030-1046. [87] H.W. Purnomo and J.F. Bard (2007). Cyclic Preference Scheduling for Nurses Using Branch and Price. Naval Research Logistics 54(2), 200-220. [88] J.F. Bard and H.W. Purnomo (2006). Incremental Changes in the Workforce to Accommodate Changes in Demand. Health Care Management Science 9(1), 71-85. [89] J.F. Bard and L. Wan (2006). The Task Assignment Problem for Unrestricted Movement between Workstation Groups. Journal of Scheduling 9(4), 315-342. [90] G. Zhu, J.F. Bard and G. Yu (2006). A Branch-and-Cut Procedure for the Multimode Resource Constrained Project Scheduling Problem. INFORMS Journal on Computing 18(3), 377-390. [91] X. Qi, J.F. Bard and G. Yu (2006). Disruption Management for Machine Scheduling: The Case of SPT Schedules. International Journal of Production Economics 103(1), 166-184. [92] J.F. Bard and S. Rojanasoonthon (2006). A Branch & Price Algorithm for Parallel Machine Scheduling with Time Windows and Job Priorities. Naval Research Logistics 53(1) 24-44. [93] X. Zhang and J.F. Bard (2006). A Multi-Period Machine Assignment Problem. European Journal of Operational Research 170(2), 398-415. [94] X. Qi and J.F. Bard (2006). Generating Labor Requirements and Rosters for Mail Handlers Using Simulation and Optimization. Computers & Operations Research 33(9), 2645-2666. [95] X. Zhang and J.F. Bard (2006). Comparative Approaches to Equipment Scheduling in High Volume Factories. Computers & Operations Research 33(1), 132-157. [96] J.F. Bard and H.W. Purnomo (2005). Hospital-Wide Reactive Scheduling of Nurses with Preference Considerations. IIE Transactions on Operations Engineering 37(7), 589-608. [97] J.F. Bard and L. Wan (2005). Weekly Scheduling in the Service Industry: An Application to Mail Processing & Distribution Centers. IIE Transactions on Scheduling & Logistics 37(5), 379-396. [98] J.F. Bard and H.W. Purnomo (2005). Short-Term Nurse Scheduling in Response to Daily Fluctuations in Supply and Demand. Health Care Management Science 8(4), 315-324. [99] J. F. Bard and H.W. Purnomo (2005). A Column Generation-Based Approach to Solve the Preference Scheduling Problem for Nurses with Downgrading. Socio-Economic Planning Sciences 39(3), 193-213. [100] J.F. Bard and H.W. Purnomo (2005). Preference Scheduling For Nurses Using Column Generation. European Journal of Operational Research 164(2), 510-534. [101] X. Zhang and J.F. Bard (2005). Equipment Scheduling at Mail Processing and Distribution Centers. IIE Transactions on Scheduling & Logistics 37(2), 175-187. [102] G. Zhu, J.F. Bard and G. Yu (2005). Disruption Management for Resource-Constrained Project Scheduling. Journal of the Operational Research Society 56, 365-381. [103] S. Rojanasoonthon and J.F. Bard (2005). A GRASP for Parallel Machine Scheduling with Time Windows. INFORMS Journal on Computing 17(1), 32-51. [104] X. Qi, J.F. Bard and G. Yu (2004). Class Scheduling for Pilot Training. Operations Research 52(1), 148-162. [105] J.F. Bard (2004). Staff Scheduling in High Volume Service Facilities with Downgrading. IIE Transactions on Scheduling & Logistics 36(10), 985-997. [106] J.F. Bard (2004). Selecting the Appropriate Input Data Set When Configuring a Permanent Workforce. Computers & Industrial Engineering 47(4), 371-389. [107] X. Qi, J.F. Bard and G. Yu (2004). Supply Chain Coordination with Demand Disruptions. Omega 32(4), 301-312. [108] R.Z. Rios-Mercado and J.F. Bard (2003). The Flowshop Scheduling Polyhedron with Setup Times. Journal of Combinatorial Optimization 7(3) 291-318. [109] S. Rojanasoonthon, J.F. Bard and S.D. Reddy (2003). Algorithms for Parallel Machine Scheduling: A Case Study of the Tracking and Data Relay Satellite System. Journal of the Operational Research Society 54(8), 806-821. [110] B.G. Thengvall, J.F. Bard and G. Yu and (2003). A Bundle Algorithm for the Aircraft Schedule Recovery Problem During Hub Closures. Transportation Science 37(4), 392-407. [111] J.F. Bard, C. Binici and A.H. deSilva (2003). Staff Scheduling at the United States Postal Service. Computers & Operations Research 30(5), 745-771. [112] P. Jaillet, J.F. Bard, L. Huang and M. Dror (2002). Delivery Cost Approximations for Inventory Routing Problems in a Rolling Horizon Framework. Transportation Science 36(3), 292-300. [113] J.F. Bard, G. Kontoravdis and G. Yu (2002). A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows. Transportation Science 36(2), 250-269. [114] X. Qi, G. Yu and J.F. Bard (2002). Single Machine Scheduling with Variable Due Dates. Discrete Applied Mathematics 122(1-3), 211-233. [115] S. Dempe and J.F. Bard (2001). A Bundle Trust-Region Algorithm for Bilinear Bilevel Programming. J. Optimization Theory and Applications 110(2), 265-288. [116] B.G. Thengvall, G. Yu and J.F. Bard (2001). Multiple Fleet Aircraft Schedule Recovery Following Hub Closure. Transportation Research, Part A: Policy and Practice 35(4), 289-308. [117] J.F. Bard, G. Yu and M.F. Arguello (2001). Optimizing Aircraft Routings in Response to Groundings and Delays. IIE Transactions on Operations Engineering 33(10), 931-947. [118] J.F. Bard, J. Plummer and J.C. Sourie (2000). A Bilevel Programming Approach to Determining Tax Credits for Biofuel Production. European Journal of Operational Research 120(1), 30-46. [119] B.G. Thengvall, J.F. Bard and G. Yu (2000). Balancing User Preferences for Aircraft Schedule Recovery during Airline Irregular Operations. IIE Transactions on Operations Engineering 32(3), 181-193. [120] J.F. Bard, K. Srinivasan and D. Tirupati (1999). An Optimization Approach to Capital Expansion in Semiconductor Manufacturing. International Journal of Production Research 37(15), 3359-3382. [121] R.Z. Rios-Mercado and J.F. Bard (1999). A Branch-and-Bound Algorithm for Flowshop Scheduling with Setup Times. IIE Transactions on Scheduling & Logistics 31(8), 721-731. [122] R.Z. Rios-Mercado and J.F. Bard (1999). An Enhanced TSP-Based Heuristic for Makespan Minimization in a Flow Shop with Setup Times. Journal of Heuristics 5(1), 53-70. [123] J.F. Bard, L. Huang, P. Jaillet and M. Dror (1998). A Decomposition Approach to the Inventory Routing Problem with Satellite Facilities. Transportation Science 32(2), 189-203. [124] J.F. Bard, L. Huang, M. Dror and P. Jaillet (1998). A Branch and Cut Algorithm for the VRP with Satellite Facilities. IIE Transactions on Operations Engineering 30(9), 821-834. [125] R.Z. Rios-Mercado and J.F. Bard (1998). Computational Experience with a Branch-and-Cut Algorithm for Flowshop Scheduling with Setup Times. Computers & Operations Research 25(5), 351-366. [126] R.Z. Rios-Mercado and J.F. Bard (1998). Heuristics for the Flow Line Problem with Setup Costs. European Journal of Operational Research 110(1), 76-98. [127] M.F. Arguello, J.F. Bard and G. Yu (1997). A GRASP for Aircraft Routing in Response to Groundings and Delays. Journal on Combinatorial Optimization 1(3), 211-228. [128] J.F. Bard (1997). An Analysis of a Rail Car Unloading Area for a Consumer Products Manufacturer. Journal of the Operational Research Society 48(9) 873-883. [129] J.F. Bard (1997). Benchmarking Simulation Software for Use in Modeling Postal Operations. Computers & Industrial Engineering 32(3) 607-625. [130] O. Goldschmidt, J.F. Bard and A. Takvorian (1997). Complexity Results for Mixed-Model Assembly Lines with Approximation Algorithms for the Single Station Case. International J. Flexible Manufacturing Systems 9(3) 251-272. [131] J.F. Bard, A.H. deSilva and A. Bergevin (1997). Evaluating Simulation Software for Postal Service Use: Technique versus Perception. IEEE Transactions on Engineering Management 44(1) 31-42. [132] T.A. Feo, J.F. Bard and S.D. Holland (1996). A GRASP for Scheduling Printed Wiring Board Assembly. IIE Transactions on Scheduling & Logistics 28(2), 155-164. [133] T.A. Feo, J.F. Bard and S.D. Holland (1995). Facility Wide Scheduling of Printed Wiring Board Assembly. Operations Research 43(2), 219-230. [134] J.K. Robinson, J.W. Fowler and J.F. Bard (1995). The Use of Upstream and Down Stream Information in Scheduling Semiconductor Batch Operations. International Journal of Production Research 33(7), 1849-1869. [135] J.F. Bard, T.A. Feo and S.D. Holland (1995). Reengineering and the Development of a Decision Support System for Printed Wiring Board Assembly. IEEE Transactions on Engineering Management 42(1), 91-98. [136] G. Kontoravdis and J.F. Bard (1995). A GRASP for the Vehicle Routing Problem with Time Windows. ORSA Journal on Computing 7(1), 10-23. [137] D. J. Crowley, J.F. Bard and P.A. Jensen (1995). Using Flow Ratio Analysis and Discrete Event Simulation to Design a Medium Volume Production Facility. Computers & Industrial Engineering 28(2), 379-397. [138] A.I.Z. Jarrah, J.F. Bard and A.H. deSilva (1994). Solving Large-Scale Tour Scheduling Problems. Management Science 40(9), 1124-1144. [139] A.I.Z. Jarrah, J.F. Bard and A.H. deSilva (1994). Equipment Selection and Machine Scheduling in General Mail Facilities. Management Science 40(8), 1049-1068. [140] J.F. Bard, A. Shtub and S.B. Joshi (1994). Sequencing Mixed-Model Assembly Lines to Level Parts Usage and Minimize Line Length. International Journal of Production Research 32(10), 2431-2454. [141] J.F. Bard, R. Clayton and T.A. Feo (1994). Machine Setup and Component Insertion for Printed Circuit Board Assembly. International Journal of Flexible Manufacturing Systems 6(1), 5-31. [142] J.F. Bard, A.H. deSilva and T.A. Feo, S.D. Wert (1993). Design of Semi-Automated Mail Processing Facilities. IIE Transaction on Design & Manufacturing 25(4), 88-101. [143] J.F. Bard, K. Venkatraman and T.A. Feo (1993). Single Machine Scheduling with Flow Time and Earliness Penalties. Journal of Global Optimization 3(3), 289-309. [144] J.F. Bard and A. Graham (1993). Developing a Data Collection System for PCB Assembly: A Case Study in Software Engineering. IEEE Transactions on Engineering Management 40(2), 191-202. [145] J.F. Bard (1992). A Comparison of the Analytic Hierarchy Process with Multiattribute Utility Theory: A Case Study. IIE Transactions 24(5), 111-121. [146] A.I.Z. Jarrah, J.F. Bard and A.H, deSilva (1992). A Heuristic for Machine Scheduling at General Mail Facilities. European Journal of Operational Research 63(2) 192-206. [147] S.B. Graves, J.L. Ringuest and J.F. Bard (1992). Recent Developments in Screening Methods for Nondominated Solutions in Multiobjective Optimization. Computers & Operations Research 19(7), 683-694. [148] J.F. Bard and J.T. Moore (1992). An Algorithm for the Discrete Bilevel Programming Problem. Naval Research Logistics 39 419-435. [149] T.A. Edmunds and J.F. Bard (1992). An Algorithm for the Mixed-Integer Nonlinear Bilevel Programming Problem. Annuals of Operations Research 34 149-162. [150] J.F. Bard, E. Dar-El and A. Shtub (1992). An Analytic Framework for Sequencing Mixed Model Assembly Lines. International Journal of Production Research 30(1), 35-48. [151] S.D. Wert, J.F. Bard, A.H. deSilva and T.A. Feo (1991). A Simulation Analysis of Semi-Automated Mail Processing Facilities. Journal of the Operational Research Society 42(12), 1071-1086. [152] T.A. Feo, K. Venkatraman and J.F. Bard (1991). A GRASP for a Difficult Single Machine Scheduling Problem. Computers & Operations Research 18(8), 635-643. [153] J.F. Bard and W.A. Bejjani (1991). Designing Telecommunications Networks for the Reseller Market. Management Science 37(9), 1125-1146. [154] J.F. Bard and B. Golany (1991). Determining the Number of Kanbans in a Multiproduct, Multistage Production System. International Journal of Production Research 29(5), 881-895. [155] T.A. Edmunds and J.F. Bard (1991). Algorithms for Nonlinear Mathematical Bilevel Programs. IEEE Trans. Systems, Man, and Cybernetics 21(1), 83-89. [156] J.F. Bard and J.E. Bennett (1991). Arc Reduction and Path Preference in Stochastic Acyclic Networks. Management Science 37(2), 198-215. [157] J.F. Bard and T.A. Feo (1991). An Algorithm for the Manufacturing Equipment Selection Problem. IIE Transactions 23(1), 83-92. [158] J.F. Bard (1991). Some Properties of the Bilevel Programming Problem. J. Optimization Theory and Applications 68(2), 371-378. [159] J.T. Moore and J.F. Bard (1990). The Mixed Integer Linear Bilevel Programming Problem. Operations Research 38(5), 911-921. [160] T.A. Edmunds and J.F. Bard (1990). A Time Axis Decomposition Technique for Large Scale Optimal Control Problems. J. Optimization Theory and Applications 67(2), 259-277. [161] J.F. Bard (1990). Using Multicriteria Methods in the Early Stages of New Product Development. Journal of the Operational Research Society 41(8) 755-766. [162] J.F. Bard and S. Sousk (1990). A Tradeoff Analysis for Rough Terrain Cargo Handlers Using the AHP: An Example of Group Decision Making. IEEE Transactions on Engineering Management EM-37(3), 222-228. [163] J.F. Bard and J.T. Moore (1990). A Branch and Bound Algorithm for the Bilevel Programming Problem. SIAM Journal on Scientific and Statistical Computing 11(2) 281-292. [164] J.F. Bard and J.T. Moore (1990). Production Planning with Variable Demand. Omega 18(1) 35-42. [165] T.A. Edmunds and J.F. Bard (1990). A Decomposition Technique for Discrete Time Optimal Control Problems with an Application to Water Resources Management. Mathematical and Computer Modelling 13(1) 61-78. [166] T.A. Feo and J.F. Bard (1989). Flight Scheduling and Maintenance Base Planning. Management Science 35(12), 1415-1432. [167] J.F. Bard (1989). Assembly Line Balancing with Parallel Workstations and Dead Time. International Journal of Production Research 27(6), 1005-1018. [168] J.F. Bard and T.A. Feo (1989). Operations Sequencing in Discrete Parts Manufacturing. Management Science 35(2), 249-255. [169] J.F. Bard and A. Feinberg (1989). A Two-Phase Approach to Technology Selection and System Design. IEEE Transactions on Engineering Management EM-36(1), 28-36. [170] J.F. Bard and J.L. Miller (1989). Probabilistic Shortest Path Problems with Budgetary Constraints. Computers & Operations Research 16(2), 145-159. [171] J.F. Bard and T.A. Feo (1989). The Cutting Path and Tool Selection Problem in Computer-Aided Process Planning. Journal of Manufacturing Systems 8(1), 17-26. [172] J.F. Bard (1988). A Heuristic for Minimizing the Number of Switches on a Flexible Machine. IIE Transactions 20(4), 382-391. [173] J.F. Bard (1988). Short-Term Scheduling of Thermal-Electric Generators Using Lagrangian Relaxation. Operations Research 36(5), 756-766. [174] J.F. Bard (1988). Convex Two-Level Optimization. Mathematical Programming 40 15-27. [175] J.F. Bard, R. Balachandra and P.E. Kaufmann (1988). An Interactive Approach to R&D Project Selection and Termination. IEEE Transactions on Engineering Management EM-35(3), 139-146. [176] J.W. Barnes, R. Hanley and J.F. Bard (1988). Scheduling Tactical Aircrews to Meet Flying Requirements. Journal of Logistics 12(4), 25-32. [177] J.F. Bard (1987). Developing Competitive Strategies for Buyer-Supplier Negotiations. Management Science 33(9), 1181-1191. [178] J.F. Bard and I.G. Cunningham (1987). Improving Through-Flight Schedules. IIE Transactions 19(3), 242-251. [179] J.F. Bard (1986). A Multiobjective Methodology for Selecting Subsystem Automation Options. Management Science 32(12), 1628-1641. [180] J.F. Bard (1986). Evaluating Space Station Applications of Automation and Robotics. IEEE Trans. Engineering Management EM-33(2), 102-111. [181] J.F. Bard (1986). An Assessment of Industrial Robots: Capabilities, Economics, and Impacts. Journal of Operations Management 6(2), 99-124. [182] J.F. Bard (1985-86). A Reliability Analysis of Occupational Exposure Data Using a Family of Proportional and Additive Hazard Functions. J. Environmental Systems 15(4), 293-306. [183] J.F. Bard and S. Chatterjee (1985). Objective Function Bounds for the Inexact Linear Programming Problem with Generalized Cost Coefficients. Computers & Operations Research 12(5), 483-491. [184] J.F. Bard (1985). Parallel Funding of R&D Tasks with Probabilistic Outcomes. Management Science 31(7), 814-828. [185] J.F. Bard (1985). Algorithmic and Geometric Developments for a Hierarchical Planning Problem. European Journal of Operational Research 19(3), 372-383. [186] S. Chatterjee and J.F. Bard (1985). A Comparison of Box-Jenkins Time Series Models with Auto-Regressive Processes. IEEE Trans. Systems, Man, and Cybernetics SMC-15(2), 252-259. [187] J.F. Bard (1984). An Investigation of the Linear Three Level Programming Problem. IEEE Trans. Systems, Man, and Cybernetics SMC-14(5), 711-717. [188] J.F. Bard (1984). Optimality Conditions for the Bilevel Programming Problem. Naval Research Logistics Quarterly 31 13-26. [189] J.F. Bard (1984). The Costs and Benefits of a Satellite-Based System for Natural Resource Management. Socio-Economic Planning Sciences 18(1), 15-24. [190] J.F. Bard (1984). Inexact Linear Programming with Generalized Technological Matrix Sets. European Journal of Operational Research 16(1), 107-112. [191] J.F. Bard (1983-84). Regulating Nonnuclear Industrial Wastes by Hazard Classification. Journal of Environmental Systems 13(1), 21-41. [192] J.F. Bard (1983). An Efficient Point Algorithm for a Linear Two-Stage Optimization Problem. Operations Research 31(4), 670-684. [193] J.F. Bard (1983). Coordination of a Multidivisional Firm Through Two Levels of Management. Omega 11(5), 457-465. [194] J.F. Bard (1983). An Algorithm for Solving the General Bilevel Programming Problem. Mathematics of Operations Research 8(2), 260-272. [195] J.F. Bard and A. Watkins (1983). Improved Rangeland Management with an Earth Resource Survey System. Technological Forecasting and Social Change 24(4), 313-329. [196] J.F. Bard (1983). The Application of a Remote Data Acquisition System to Livestock Management: Benefit Estimation. Socio-Economic Planning Sciences 17(2), 49-56. [197] J.F. Bard and J.E. Falk (1982). A Separable Programming Approach to the Linear Complementarity Problem. Computers & Operations Research 9(2), 153-159. [198] J.F. Bard and J.E. Falk (1982). An Explicit Solution to the Multi-Level Programming Problem. Computers & Operations Research 9(1), 77-100. [199] J.F. Bard (1981). An Analytic Model of the Reaction Time of a Naval Platform. IEEE Trans. Systems, Man, and Cybernetics SMC-11(10), 723-726. [200] J.F. Bard and J.E. Falk (1980). Computing Equilibria Via Nonconvex Programming. Naval Research Logistics Quarterly 27 233-255. [201] J.F. Bard (1979-80). A Decision Model for the Regulation of Hazardous Wastes. Journal of Environmental Systems 9(4), 235-248. [202] J.F. Bard (1978). The Use of Simulation in Criminal Justice Policy Analysis. Journal of Criminal Justice 6(2), 99-116. [203] J.F. Bard (1978). A Criminal Justice Model for Policy Analysis. IEEE Trans. Systems, Man, and Cybernetics SMC-8(3), 208-214. [204] J.F. Bard (1978). A Systems Dynamics Evaluation of Alternative Crime Control Policies. Justice System Journal 3/3, 242-263.PROCEEDINGS
[205] D.J. Morrice J.F. Bard, H. Mehta, S. Sahoo, N.B. Arunachalam and P. Benkatraman (2018). Using Simulation to Design a WorkLife Integrated Practice Unit. Proceedings of the 2018 Winter Simulation Conference. M. Rabe, A.A. Juan, N. Mustafee, A. Skoogh, S. Jain, and B. Johansson (eds.), pp. 2624-2635, Gothenburg, Sweden.[206] D.J. Morrice, D. Wang, J.F. Bard, L. Leykum, S. Noorily and P. Veerapaneni (2013). A Simulation Analysis of a Patient-Centered Surgical Home to Improve Outpatient Surgical Processes of Care and Outcomes. Proceedings of the 2013 Winter Simulation Conference. R. Pasupathy, S.-H. Kim, A. Tolk, R. Hill and M. E. Kuhl (eds), pp. 2274-2286, Washington, D.C.
[207] S.K. Monkman, D.J. Morrice and J.F. Bard (2005). Scheduling Product Families in a High Volume, Flexible, Assemble-to-Order Factory. Proceedings of the 2nd Multidisciplinary International Conference on Scheduling: Theory & Applications, G. Kendall, L. Lei and M. Pinedo (eds.), 394-395, New York.
[208] J.F. Bard and H.W. Purnomo (2004). Real-Time Scheduling for Nurses in Response to Demand Fluctuations and Personnel Shortages. M.A. Trick and E.K. Burke (editors) Proceedings of the 5th International Conference on the Practice and Theory of Automated Timetabling, 67-87, Pittsburgh.
[209] J.F. Bard (2004). Midterm and Short-term Personnel Scheduling in Healthcare Facilities. Proceedings of the NSF Design, Service and Manufacturing Grantees and Research Conference, http://engr.smu.edu/nsf2004/ Dallas, TX.
[210] J.F. Bard (2003). Modeling and Analysis of Staff Scheduling in a High Volume Work Center. Proceedings of the NSF Design, Service and Manufacturing Grantees and Research Conference, http://bama.ua.edu/~nsf2003/ Birmingham, AL.
[211] S. Dempe and J.F. Bard (2000). A Bundle Trust Region Algorithm for Bilinear Bilevel Programming. K. Inderfurth et al. (editors), Proceedings of the Magdeburg Symposium on Operations Research, 7-12, Springer Verlag, Berlin.
[212] J.F. Bard, M.F. Arguello and G. Yu (1998). Real-Time Rescheduling of Aircraft due to Equipment Failures and Delays. Proceedings of the Triennial Symposium on Transportation Analysis (TRISTAN III) 1, 17 – 20, San Juan, Puerto Rico.
[213] J.F. Bard, T.A. Feo and S.D. Holland (1995). Design of A Decision Support System for Printed Wiring Board Assembly. Proceedings of the 13th International Conference on Production Research, 652-654, Jerusalem, Israel.
[214] J.F. Bard, A.I.Z. Jarrah and A.H. deSilva (1992). A Hierarchical Approach to Equipment Selection and Scheduling at a General Mail Facility. Proceedings of the 5th USPS Advanced Technology Conference 1, 137-151, Washington, D.C. (Invited Paper).
[215] J.F. Bard and B. Golany (1991). Optimal Kanban Policies for Production and Inventory Control. Proceedings of the 11th International Conference on Production Research 1, 193-196, Hefei, China.
[216] J.F. Bard, A.H, deSilva and T.A. Feo (1990). Optimally Configuring General Mail Facilities. Proceedings of the 4th USPS Advanced Technology Conference 3, 1381-1391, Washington, D.C. (Invited Paper).
[217] J.F. Bard and M. Wambsganss (1989). A Matching-Based Interactive Method for MCDM. Proceedings of the International Conference on Multiple Criteria Decision Making: Applications in Industry and Service, 963-978, Asian Institute of Technology, Bangkok.
[218] J.F. Bard (1987). Optimizing Short-Term Electrical Power Distribution. Proceedings of the International Industrial Engineering Conference, 511-515, Washington, D.C.
[219] J.F. Bard and J.E. Falk (1982). Necessary and Sufficient Conditions for the Linear Three Level Programming Problem. Proceedings of the 21th IEEE Conference on Decision and Control 2, 642-646, Orlando (Invited Paper).
[220] J.F. Bard (1982). A Grid Search Algorithm for the Linear Bilevel Programming Problem. Proceedings of the 14th Annual Meeting of the American Institute for Decision Sciences 2, 256-258, San Francisco.
[221] J.F. Bard (1982). Optimization in Multilevel Systems. Proceedings of the American Control Conference 1, 403-408, Arlington (Invited Paper).
[222] J.F. Bard (1981). Analyzing the Hazardous Waste Problem from a Government Perspective. Proceedings of the National Council for Air and Stream Improvement Conference, 197-203, Boston (Invited Paper).
[223] J.F. Bard (1981). An Engagement Effectiveness Model for Surface Ships. Proceedings of the Winter Simulation Conference 1, 83-88, Atlanta.
[224] J.F. Bard (1981). Hierarchical Planning in a Decentralized Organization. Proceedings of the 13th Annual Meeting of the American Institute for Decision Sciences 2, 124-126, Boston.
[225] J.F. Bard (1977). Criminal Justice Dynamics: A Planning Model. Proceedings of the Winter Simulation Conference 1, 258-268, Gaithersburg.
PAPERS IN REVIEW
[226] L.C. Riascos-Alvarez, R.Z. Rios-Mercado and J.F. Bard (2019). New Formulations and Algorithms for the Kidney Exchange Problem, Working paper, Universidad Autónoma de Nuevo Leon, Mo San Nicolas de los Garza, Mexico. [227] L. Novoa, A.I. Jarrah, J.F. Bard, X. Xhang, S. Lin (2017). Optimizing Daily Service Routes for Major Grocery Chains. Submitted to Computers & Operations Research. [228] C. Ruf, J.F. Bard and R. Kolisch (2021). Workforce Capacity Planning with Hierarchical Skills, Long-term Training and Random Resignations. Working paper, Technical University of Munich, Germany. [229] G. Jayadev, B.D. Leibowicz, J.F. Bard, Calci (2021). Strategic Interactions between Liquefied Natural Gas and Domestic Gas Markets: A Bilevel Model. Working paper. Graduate Program in Operations Research & Industrial Engineering, The University of Texas, Austin. Submitted to Computers & Operations Research. [230] J. Guo and J.F. Bard (2021). A Column Generation-Based Algorithm for Midterm Nurse Scheduling with Specialized Constraints, Preference Considerations, and Overtime. Submitted to Computers & Operations Research.BOOK REVIEWS
[231] Lean Logistics: The Nuts and Bolts of Delivering Materials and Goods by Michel Baudin, Productivity Press, New York (2005). Appearing in IIE Transactions on Operations Engineering 38(9), 2006. [232] Introduction to Linear Optimization by D. Bertsimas and J. N. Tsitsiklis, Athena Scientific, Belmont, MA (1997). Appearing in Interfaces 30(4), 2000. [233] Integer Programming by L.A. Wolsey, John Wiley & Sons, New York (1998). Appearing in IIE Transactions on Operations Engineering 32(3), 2000. [234] The Engineer’s Cost Handbook: Tools for Managing Project Costs by R.E. Westney (editor), Marcel Dekker, New York (1997). Appearing in IIE Transactions on Operations Engineering 30(3),1998. [235] Mathematical Programming for Industrial Engineers edited by M. Avriel and B. Golany, Marcel Dekker, New York (1996). Appearing in IIE Transactions on Operations Engineering 29(9), 1997. [236] Engineering Optimization: Theory and Practice, Third Edition, by S. S. Rao John Wiley & Sons, New York (1996). Appearing in IIE Transactions on Operations Engineering 29(9), 1997. [237] Introduction to the Theory of Nonlinear Programming by J. Jahn, Springer-Verlag, Berlin (1994). Appearing in Interfaces 26(3), 1996. [238] Perturbation Theory in Mathematical Programming and its Applications by E. S. Levitin, John Wiley & Sons, New York (1994). Appearing in IIE Transactions on IE Research 28(1), 1996. [239] Heuristic Scheduling Systems by T.E. Morton and D.W. Pentico, John Wiley & Sons, New York(1993). Appearing in IEEE Transactions on Engineering Management 42(4), 1995. [240] The Analytic Hierarchy Process: Applications and Studies by B.L. Golden, E. Wasil and P.T. Harker (editors), Springer-Verlag, Berlin (1989). Appearing in Interfaces 21(2), 1991. [241] Project Management: Strategic Design and Implementation by David I. Cleland, TAB Books, Blue Ridge Summit, PA (1990). Appearing in IEEE Transactions on Engineering Management 38(2), 1991. [242] Managerial Decisions Under Uncertainty: An Introduction to the Analysis of Decision Making by Bruce F. Baird, John Wiley & Sons, New York (1989). Appearing in IEEE Transactions on Engineering Management 38(1), 1991. [243] Integer and Combinatorial Optimization by G.L. Nemhauser and L.A. Wolsey, John Wiley & Sons, New York (1988). Appearing in IIE Transactions 20(4), 1988. [244] Multiple Criteria Decision Methods and Applications by G. Fandel and J. Spronk (eds.), Springer-Verlag, Berlin (1985). Appearing in Interfaces 18(4), 1988. [245] Techniques for Multiobjective Decision Making in Systems Management by F. Szidarovszky, M.E. Gershon, and L. Duckstein, Elsevier Science Publishers, Amsterdam (1986). Appearing in Interfaces 18(2), 1988. [246] Linear Programming by K.G. Murty, John Wiley & Sons, New York (1983). Appearing in Interfaces 15(5), 1985. [247] Quantitative Models For Management by K.R. Davis and P.G. McKeown, Kent Publishing Co. (1981). Appearing in Interfaces 15(3), 1985. [248] Management Science Applications: Computing and Systems Analysis by H.K. Eldin with H.M. Beheshti, North-Holland, Amsterdam (1981). Appearing in Interfaces 13(5), 1983. [249] Decision Models For Management by J. Byrd, Jr. and L.T. Moore, McGraw-Hill, New York (1982). Appearing in Interfaces 13(5), 1983.ARTICLES
[250] C.-Y. Lee, J.F. Bard, M. Pinedo and W.E. Wilhelm (1993). Guidelines for Reporting Computational Results in IIE Transactions. IIE Transactions 25(6), 121-123.
EDITED VOLUMES
[252] J.F. Bard and C. Barnhart (2006). Planning and Scheduling Problems in Airline Operations. Special Issue of the Journal of Scheduling 9(3), 199-201.
TEACHING MATERIAL
[254] Instructor’s Manual (2005), Project Management: Processes, Methodologies, and Economics, Prentice Hall, Upper Saddle River, NJ.
Invited Lectures
History of Operations Research and Supply Chains, Alibaba, Hangzhou, China (August 2019).
Application of Operations Research in Supply Chain Management, Alibaba, Hangzhou, China (August 2019).
Investigation of Transportation Options for Economically Disadvantaged Patients at the Family Health Center, University Hospital System, San Antonio (May 2019).
Monthly Assignment of Clinic Duty to Internal Medicine Residents, The Technical University of Munich, Munich, Germany (August 2018).
Internal Mail Transport at Mail Processing & Distribution Centers, Annual Industrial & Systems Engineering Research Conference, Best Paper Award, Orlando, FL (May 2018).
4+1 Annual Block Scheduling, INFORMS Computing Society Conference, Austin, TX (January 2017).
Monthly Clinic Assignments for Internal Medicine Residents. Department of Industrial & Systems Engineering, North Carolina State University, Raleigh, NC (February 2016).
Scheduling Internal Medicine Residents for Monthly Clinic Duty. Department of Industrial & Systems Engineering, Pennsylvania State University, State College, PA (April 2015).
An Investigation of Operations at an Outpatient Clinic, Wright State University, Kettering Distinguished Lecture, Dayton, OH (November 2014).
Planning and Scheduling for Healthcare Workers, CLAIO XVII/CSMIO III, Plenary Speaker, Monterrey, Mexico (October 2014).
Weekly Planning for Home Healthcare Delivery, Technical University of Munich, Germany (June 2014).
Monthly Clinic Assignments for Residents, The George Washington University, Washington, DC (May 2014).
Clinic Scheduling for Internal Medicine Housestaff, University of Houston, Houston, TX (February 2014).
Improving Healthcare Delivery Through University-Industry Collaboration, IEEE Communications & Signal Processing Society Annual Meeting, Austin, TX (December 2013).
Optimizing Healthcare Worker Schedules, University of Texas Systems Engineering Healthcare Conference, Houston, TX (November 2013).
Staff Scheduling, Value Stream Mapping & Process Improvement at Care Institutions, Health Technology Forum, Austin, TX (October 2013).
Implementing a Patient-Centered Surgical Home to Improve Out-Patient Surgical Processes of Care and Outcomes, McCombs Healthcare Initiative Symposium, Austin, TX (April 2013).
Designing Driver Work Areas for Pickup & Delivery Operations, HEC, University of Montreal, Montreal, Canada (December 2012).
An Integer Programming Model for Nurse Scheduling in Operating Room Suites, UT Systems Engineering Conference, MD Anderson, Houston, TX (October 2012).
Weekly Routing and Scheduling of Home Healthcare Workers, University of Houston, Houston, TX (February 2012).
Designing Pickup and Delivery Routes in a Local Service Area, Guangxi University of Technology, Liuzhou, China (December 2010).
Flight Schedule Reoptimzation after Groundings & Delays, Guangdong University of Technology, Guangzhou, China (December 2010).
Creating Vehicle Routing Zones for Pickup & Delivery Carriers, Transportation & Logistics Workshop, The Complex Engineering Systems Institute, Plenary Speaker, Renaca, Chile (December 2009).
Solving Large-Scale Integer Programs with Column Generation, Technical University of Munich, Germany (July 2009).
Using Branch and Price to Solve the Midterm Physician Scheduling Problem, EURO XXIII, Bonn, Germany (July 2009).
Mid-term Scheduling of Physicians in Hospitals. POMS Conference, Orlando, FL (May 2009).
Work Area Design for Local Pickup & Delivery Operations. Northwestern University, Evanston, IL (November 2008).
Perspective on Issues and Problems in Health Systems Engineering: Opportunities for Operations Research & Industrial Engineering. North Carolina State University, Raleigh (April 2008).
Using Branch and Cut to Solve the Vehicle Routing Problems with Time Windows. Royal Institute of Technology, Stockholm (June 2007).
Cyclic Nurse Scheduling Using a Bundle Method. Linköping University, Linköping, Sweden (June 2007).
Solving Large-Scale Staff Scheduling Problems with Column Generation. International Workshop on Optimization (IWOS2005), Shanghai (May 2005).
Heuristics and Exact Methods for Vehicle Routing Problems with Time Windows. Nankai University, Tianjin, China (May 2005).
Daily Adjustments to Staff Schedules Using Branch and Price: A Nurse Management Application. Department of Industrial Engineering and Engineering Management, Hong Kong University of Science and Technology, Hong Kong (May 2005).
Personnel Planning and Scheduling in the Service Industry. Annual IIE Conference, Atlanta (May 2005).
Optimizing Aircraft Routings in Response to Groundings and Delays. Annual IIE Conference, Best Paper, Portland (May 2003).
Solving Vehicle Routing Problems with Time Windows Using Branch and Cut. Universidad Autónoma de Nuevo León, Monterrey, Mexico (March 2003).
From Model Development to Implementation: Increasing the Chances for Success. 12th Annual Industrial Engineering and Management Conference, Keynote Speaker, Tel Aviv, Israel (March 2002).
Using OPL Studio to Implement a Staffing Algorithm for the Service Industry. Office of Technology, US Department of Transportation (July 2000).
Algorithms for Rescheduling Aircraft Due to Flight Disruptions. University of Arizona, Tucson (November 1998).
Solution Procedures for a Class of Routing Problem. Texas A&M University, College Station (February 1998).
Implementing a Branch and Cut Algorithm for the Vehicle Routing Problem with Time Windows. Center for Operations Research and Econometrics, Louvain-la-Neuve, Belgium (March 1996).
Designing Long Distance Telecommunications Networks. Royal Institute of Technology, Stockholm, Sweden (June 1995).
The Use of Simulation Methodologies to Design Mail Processing Facilities. Ministry for Posts and Telecommunications. Tokyo, Japan (June 1994).
Production Planning and Decision Support for Printed Wiring Board Assembly. Center for Economic Research, Tilberg University, The Netherlands (May 1994).
Heuristics and Exact Methods for the Vehicle Routing Problem. Department of Economics, Free University of Berlin, Germany (April 1994).
Sequencing Mixed-Model Assembly Lines to Maximize System Performance. College of Engineering, École Centrale de Lille, France (March 1994).
Reengineering and Production Planning for Electronic Assembly. Workshop on Mathematical Models of Organizational Design, European Institute of Advanced Studies in Management, Brussels, Belgium (March 1994).
Personnel Scheduling in Service Organizations. School of Management, Erasmus University, Rotterdam, The Netherlands (March 1993).
Using Decomposition to Solve the Tour Scheduling Problem. 3rd Stockholm Optimizations Days, Keynote Speaker (July 1992).
Machine Scheduling in General Mail Facilities. Decision Sciences Department, College of Business Administration, University of Arizona, Tucson (February 1992).
Some Theoretical and Algorithmic Results for Sequencing Mixed Model Assembly Lines. Optimization Days, University of Montréal, Quebec, Canada (May 1992).
Modeling and Analysis of Mail Processing Facilities. U.S. Postal Service, Headquarters, Washington, D.C. (December 1991).
Network Design for Resellers of Long Distance Services. San Marcos Telephone Company, San Marcos, TX (April 1991).
Optimally Configuring General Mail Facilities. Fourth USPS Advanced Technology Conference, Washington, D.C. (November 1990).
Algorithms for Mixed Integer Linear Programming. Technion, Israel Institute of Technology, Faculty of Industrial Engineering and Management, Haifa (April 1990).
Equipment Selection and Machine Scheduling for Mail Processing. Department of Industrial Engineering, Tel Aviv University, Ramat Aviv, Israel (November 1989).
Use of Multicriteria Methods for Evaluating Advanced Technologies. Johnson Space Center, NASA, Houston (June 1989).
Convex and Linear Bilevel Programming. Optimization Days, University of Montréal, Quebec, Canada (May 1989).
Decomposition Techniques for Short-Term Scheduling of Electric Power Generators. Department of Industrial Engineering, Texas A&M University, College Station (October 1988).
Recent Developments in Mixed Integer Linear Programming. Department of Operations Research, University or North Carolina, Chapel Hill (March 1987).