Since the lab now has water, it is almost a real fluid mechanics laboratory. Check out a couple pictures of its evolution…
The original “before,” taken November 2017 –
Slightly less “before,” as of January 2018, complete with finished/insulated walls, a sink, an emergency shower and eyewash (which works — we tried!) and the base for a fume hood –
And finally, current photo as of March 2018, now with water along the walls, drop-down electrical outlets from the ceiling, ceiling insulation (gotta keep in the AC!) and waterproof floors –
Coming improvements include furniture, laser warning lights, and all the fixings to explore what science wants us to learn. Stay tuned!